TECHNICAL BRIEFING SHEET
City Public Service
Permit Nos. 70492 and PSD-TX-1037
PROJECT DESCRIPTION: CPS has requested a permit to construction a new pulverized coal-fired utility boiler to be called Spruce 2 and ancillary equipment capable of producing approximately 750 net megawatts of electricity, with a heat input of approximately 8,000 MMBtu/hour. The primary fuel that will be fired in the boiler will be low-sulfur western subbituminous coal from the Powder River Basin (PBR). Emissions from the boiler will be controlled with combustion controls, a wet flue gas desulfurization system, a selective catalytic reduction system, and a fabric filter dust collection system. Associated ancillary equipment was also evaluated for BACT and impacts.
TYPE OF REVIEW: A PSD review was triggered for the following criteria pollutants: VOC, PM/PM10, CO, H2SO4, Pb, and Fluorides (as HF). CPS was able to net out of PSD for NOx and SO2. CPS will enhance the existing Spruce 1 scrubber to net out of PSD for SO2. CPS will over control NOx from J.T. Deely Units 1 and 2, Spruce Unit 1, and O.W. Sommers Units 1 and 2.
PSD - BEST AVAILABLE CONTROL TECHNOLOGY (BACT):
Emissions from the utility boiler will be controlled with combustion controls, a wet flue gas desulfurization (FGD) system, a selective catalytic reduction system, and a fabric filter dust collection system. CPS proposes the emission limits listed below as BACT for the Utility boiler. Note that the hourly emissions include routine start-up, shut down, and maintenance emissions.
|
Pollutant |
1- Hour Emission Rate (lb/MMBtu) |
Annual Emission Rate (lb/MMBtu) |
|
NOx |
0.2 |
0.069* and 0.05 |
|
SO2 |
0.36 |
0.10* and 0.06 |
|
CO |
0.56 |
0.15 |
|
PM/PM10 |
0.033 |
0.022 |
|
Pb |
2.2 E-5 |
8.4E-6 |
|
VOC |
0.0036 |
0.0025 |
|
Fluorides (as HF) |
0.008 |
0.0008 |
|
H2SO4 |
0.0055 |
0.0037 |
* Note: 30-day rolling average
NAAQS & INCREMENT: Predicted impacts from the project are as follows:
|
Pollutant |
Averaging Period |
Maximum Impact (µg/m3) |
De Minimus
Level (µg/m3) |
Increment Consumed (µg/m3) |
Allowable Increment (µg/m3) |
NAAQS Level (µg/m3) |
|
NO2 |
Annual |
0.32 |
1 |
n/a |
25 |
100 |
|
CO |
1-hour |
511 |
2,000 |
none |
n/a |
40,000 |
| |
8-hour |
110 |
500 |
none |
n/a
|
10,000 |
|
SO2 |
3-hour |
52.7 |
25 |
n/a |
512 |
1300 |
| |
24-hour |
1.96 |
5 |
n/a |
91 |
365 |
| |
Annual |
0.00013 |
1 |
n/a |
20 |
80 |
|
Pb |
Quarter |
0.0003 |
0.2 |
n/a |
n/a |
1.5 |
|
Flourides (as HF) |
24-hour |
0.12 |
n/a |
n/a |
n/a |
n/a |
|
PM10 |
24-hour |
3.07 |
5 |
n/a |
30 |
150 |
| |
Annual |
0.33 |
1 |
none |
17 |
50 |
ADDITIONAL IMPACTS: Project is not expected to affect the visibility, soils, nor vegetation in the area. There are no Class I areas within 430 km of the proposed facility.
PROCESSING TIME: Application received November 2003
Application technically complete November 2004
|
|