TECHNICAL BRIEFING SHEET
City Public Service
Permit Nos. 70492 and PSD-TX-1037

PROJECT DESCRIPTION: CPS has requested a permit to construction a new pulverized coal-fired utility boiler to be called Spruce 2 and ancillary equipment capable of producing approximately 750 net megawatts of electricity, with a heat input of approximately 8,000 MMBtu/hour. The primary fuel that will be fired in the boiler will be low-sulfur western subbituminous coal from the Powder River Basin (PBR). Emissions from the boiler will be controlled with combustion controls, a wet flue gas desulfurization system, a selective catalytic reduction system, and a fabric filter dust collection system. Associated ancillary equipment was also evaluated for BACT and impacts.

TYPE OF REVIEW: A PSD review was triggered for the following criteria pollutants: VOC, PM/PM10, CO, H2SO4, Pb, and Fluorides (as HF). CPS was able to net out of PSD for NOx and SO2. CPS will enhance the existing Spruce 1 scrubber to net out of PSD for SO2. CPS will over control NOx from J.T. Deely Units 1 and 2, Spruce Unit 1, and O.W. Sommers Units 1 and 2.

PSD - BEST AVAILABLE CONTROL TECHNOLOGY (BACT):

Emissions from the utility boiler will be controlled with combustion controls, a wet flue gas desulfurization (FGD) system, a selective catalytic reduction system, and a fabric filter dust collection system. CPS proposes the emission limits listed below as BACT for the Utility boiler. Note that the hourly emissions include routine start-up, shut down, and maintenance emissions.

Pollutant

1- Hour Emission Rate (lb/MMBtu)

Annual Emission Rate (lb/MMBtu)

NOx

0.2

0.069* and 0.05

SO2

0.36

0.10* and 0.06

CO

0.56

0.15

PM/PM10

0.033

0.022

Pb

2.2 E-5

8.4E-6

VOC

0.0036

0.0025

Fluorides (as HF)

0.008

0.0008

H2SO4

0.0055

0.0037


* Note: 30-day rolling average

NAAQS & INCREMENT: Predicted impacts from the project are as follows:

Pollutant

Averaging Period

Maximum Impact (µg/m3)

De Minimus
Level (µg/m3)

Increment Consumed (µg/m3)

Allowable Increment (µg/m3)

NAAQS Level (µg/m3)

NO2

Annual

0.32

1

n/a

25

100

CO

1-hour

511

2,000

none

n/a

40,000

 

8-hour

110

500

none

n/a

10,000

SO2

3-hour

52.7

25

n/a

512

1300

 

24-hour

1.96

5

n/a

91

365

 

Annual

0.00013

1

n/a

20

80

Pb

Quarter

0.0003

0.2

n/a

n/a

1.5

Flourides (as HF)

24-hour

0.12

n/a

n/a

n/a

n/a

PM10

24-hour

3.07

5

n/a

30

150

 

Annual

0.33

1

none

17

50

ADDITIONAL IMPACTS: Project is not expected to affect the visibility, soils, nor vegetation in the area. There are no Class I areas within 430 km of the proposed facility.

PROCESSING TIME: Application received November 2003
Application technically complete November 2004

 

learn ] [ act ] [ donate ] [ subscribe ] [ activists ] [ links ] [ about ] [ home ]

Sustainable Energy & Economic Development
1801 Westlake Dr. #209 | Austin TX 78746
phone (512)797-8481 | fax (512)306-1359

© All Rights Reserved SEED Coalition